The use of pre engineered steel buildings in the commercial as well as residential sector is increasing day by day. Some of the main reasons for this popularity are the low cost of construction, reduction in the time taken for the construction, environment friendly construction etc. However, there are a few factors to consider before selecting a pre engineered building to extract the maximum benefits out of it and to ensure long durability.
1) Legal formalities : Although pre engineered buildings are easy to construct and take a much lesser time to be erected at the construction site, yet there are a few legal formalities that have to be take care of. The building should be of an authorized design and should comply with all legal norms like fire safety, electric norms, etc. All these legal formalities should be complied with while designing and constructing pre engineered steel buildings, in order to get approval from the government.
2) Monetary factors: It is essential to carefully study the total expenditure estimate provided by the steel building supplier in order to check for any discrepancies. As a buyer, you should compare the expenditure estimates provided by different suppliers, so that the best deal could be selected. However, price should not be the only consideration while selecting a steel building supplier. If the same deal is offered at different prices by different suppliers, then the reason for such a discrepancy should be analyzed. It is not advisable to compromise on quality for a lower price.
3) Quality of material used: The most crucial component of a pre engineered building is the quality of material used in the construction activity. Steel is the main construction material used in prefabricated steel buildings. Therefore it is essential that the best quality steel is used, to ensure maximum effectiveness and durability. Other materials such as insulation panels, flooring material, electrical components, etc should also be of high quality for proper effectiveness.
4) Construction time: Although the construction time for pre engineered steel buildings is comparatively lesser than that of conventional buildings, yet different steel building supplier offer different construction time. Generally the whole process of fabricating and erection takes around 60-90 days. This time span should be clearly discussed before finalizing the project to avoid any ambiguity in the future.
These are some of the essential points to consider and clarify with the supplier before going in for pre engineered steel buildings to maximize the effectiveness of the building and avoid any confusion in the future.
The author is a business writer .Visit at www.coldsteels.com to know more about pre engineered building , prefabricated steel buildings and pre engineered steel buildings.